• Home
  • About Us
  • Services
      • Back
      • for DOT Primes
      • for DOTs
      • for Court Systems
      • for SMBS
      • for Publishers
  • Solutions
  • Projects
      • Back
      • Technology
      • Engineering
  • Blogs

Concrete/Bridge Maintenance Repairs

Department Of Public Works / Engineering Division - Arlington County

Concrete/Bridge Maintenance Repairs & CMIS Data entry (Project Number:     013.319/TC80)

Task: CMIS

Task: Arlington County Bridge Master Plan (Arlington County Stormwater - Funding Feasibility Study)

Task: Load Ratings for Bridge 5014 (SBL N. Sycamore Street over Four Mile Run) and Bridge 5015 (MBL N. Sycamore Street over Four Mile Run)

Task: Removal and Replacement of East/West Pedestrian Bridge at Barcroft Park: Providing general bridge structure repair and maintenance, and related work on an as-needed basis for up to a three-year period.

Task: Removal and Replacement of West Pedestrian Bridge at Barcroft Park

 

Rehabilitation Alternatives for Shirlington Road Bridge

Department Of Public Works / Engineering Division - Arlington County

Task: Rehabilitation Alternatives, Shirlington Road Bridge over Four Mile Run, Str. No. 8900)

Structural Work at Dominion Vault

Department Of Public Works / Engineering Division - Arlington County

Task: Structural Work at Dominion Vault: 9th Street North – N. Stuart St. to N. Stafford St. Phase Two Ballston Project

The WalkArlington program has undertaken a pilot project in the Ballston area of Arlington County to encourage more people to walk more often to get about the County. The project calls for the construction of a traffic nub at the intersection of North Stuart Street and 9th Street North that will calm vehicular traffic and considerably enhance the sidewalk area available to pedestrians in the vicinity for walking.

Renovation of Steel Pedestrian Bridge

Department Of Public Works / Engineering Division - Arlington County

Task: Renovation of Steel Pedestrian Bridge over Arlington Boulevard at North Jackson Street: The renovation of this bridge includes the main bridge span as well as two ramps and a set of stairs.

  • Traffic Control Plan and Permit Application Preparation
  • Electrical Plan and Permit Application Preparation
  • Structural Design and Drawing Preparation
  • Shop Drawings, As-Builts, and Reports
  • Construction Management and Paint Testing

Form-work Shop Drawings

Department Of Public Works / Engineering Division - Arlington County

Task: Form-work Shop Drawings for Lyon Village Retaining Walls (per Specification 033000.1.04D )

  • Develop Formwork Shop Drawings as described in Specification Section 033000, paragraph 1.04D
  • The length of the retaining wall is approximately 210' along with North and East section of the tennis courts as shown on Plan Sheet 7
  • The shop drawing shall be prepared by or under the supervision of a qualified professional engineer
  • The show drawings will contain detail the notes related to the fabrication, assembly, support and stripping of formwork
  • Use the aluminum formwork from Western Forms
  • Shoring and Reshoring is called for in the specification but that process applies to multi-story building slabs, not to vertical retaining walls

Page 6 of 7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7

Relevant Articles

  • As-Built Plans Preparation Process
  • BMP Construction Inspection
  • BMP Maitenance & SWM Summaries
  • Bridge Rehabilitation
  • Cataloging and Data QA for Drainage and SWM Assets
  • Comprehensive Project Planning and Miscellaneous Consulting Services
  • Concrete/Bridge Maintenance Repairs
  • Design of Traffic Control Devices
  • Develop Short-Term Freeway Improvement Concepts along US 301
  • Development of As-Built Plans in MicroStation V8
  • F49 VMS Project CPM Schedule
  • Form-work Shop Drawings
  • Fort McHenry Tunnel Lane Control Signals & Dynamic Message Sign System Upgrade
  • Greenbelt Metro Area Sector Plan
  • I-95 Welcome Center Truck Parking
  • ICC IEM Support
  • NPDES Services
  • Outfall Restoration Assessments
  • Painting of Skywalk at Shirlington Library
  • Pavement Engineering Technician Onsite at OMT
  • Physical Needs Assessment of Housing Authority of Baltimore City (HABC) Apartments
  • Preparation of Work Orders for 35 BMPs
  • Rehabilitation Alternatives for Shirlington Road Bridge
  • Renovation of Steel Pedestrian Bridge
  • Safety Inspection of Support Structures / Traffic Control Devices
  • Sign Inspections
  • Structural Work at Dominion Vault
  • SWM Asset and Drainage ID and Cataloging Support
  • Update SWAMP Geo-Database to link Access Permit asset documents
  • Video Pipe Cleaning/Inspection Support Services
  • Washington Dulles International Airport (IAD) Sign Replacements
© 2024 RAM Consulting Corporation